105+ work orders in the last five years — reformer, reactor, heater and boiler pressure-part replacement, heavy equipment, tanks, high-pressure piping, shutdowns and complete mechanical projects at India's leading process plants.

Reformer Replacement & Repair

Replacement of 408 Reformer Tubes — Ammonia-IV Plant

GSFC · Vadodara, Gujarat

Complete replacement of the reformer tubes of the Ammonia-IV plant during the April 2013 shutdown: dismantling, removal, installation, alloy welding, inspection and testing.

Scale: 408 reformer tubes

Reactor Replacement & Repair

Installation and Replacement of Urea Reactor Trays

IFFCO · Kalol, Gujarat

Installation and replacement of urea reactor trays under Casale licence, with internal access, fit-up and inspection.

Scale: Urea reactor internals

EPC & Complete Project Execution

400 MTPD Ammonium Sulphate-IV Project — Mechanical Works

GSFC · Vadodara, Gujarat

Erection of equipment, machinery and package units; supply of material; fabrication and erection of piping and all associated mechanical works.

Scale: 400 MTPD plant

Heavy Equipment Erection

Secondary Waste Heat Exchanger 102-C Replacement

GSFC · Vadodara, Gujarat

Dismantling, rigging, removal and replacement of the secondary waste heat exchanger 102-C, with alignment and reconnection.

Scale: Waste heat exchanger

Industrial Tank Design & Fabrication

Refurbishment of ARN/NGL Bulk Storage Tank to API 653

KRIBHCO · Hazira, Gujarat

Redesign and refurbishment of the existing bulk storage tank to API 653: shell and bottom repairs, nozzle work and testing.

Scale: 26 m dia × 12.5 m ht, 5500 KL

Boiler Pressure Parts & IBR

Replacement of APH (E-07) by Economizer

GSFC · Vadodara, Gujarat

Removal of the air pre-heater and installation of a new economizer in the SA-III plant.

Scale: 105 MT economizer

Reactor Replacement & Repair

Replacement of Shell Parts — Second Vacuum Separator

GNFC · Bharuch, Gujarat

Replacement of shell parts of the second vacuum separator, a urea plant pressure part, with welding, heat treatment and testing.

Scale: Urea plant pressure part

Boiler Pressure Parts & IBR

Replacement of Incoloy Liners — 101-CB Waste Heat Boiler

IFFCO · Kalol, Gujarat

Replacement of the high-alloy Incoloy liners of the 101-CB waste heat boilers.

Scale: High-alloy liner replacement

Industrial Heater Replacement & Repair

Erection of 3 Nos. Ketene Furnaces

Gujarat

Erection of Ketene furnaces 101, 102 and 103 including refractory.

Scale: 3 furnaces with refractory

Heavy Equipment Erection

Replacement of 40 MT Ammonia Tube Bundle

KRIBHCO · Hazira, Gujarat

Critical IBR job: removal and replacement of the ammonia plant tube bundle during shutdown.

Scale: 40 MT tube bundle

Industrial Shutdown & Maintenance

CPP IBR Piping and 18-inch P91 Valve Replacement — TA-2026

Nayara Energy · Vadinar, Gujarat

Captive power plant IBR piping including replacement of an 18-inch P91 valve, with non-IBR and cold-service jobs, during the 2026 turnaround.

Scale: Turnaround job, P91

Industrial Tank Design & Fabrication

Fabrication and Erection of Stainless-Steel Tanks — Nano Fertiliser Plant

IFFCO · Phulpur, Uttar Pradesh

Fabrication and erection of stainless-steel tanks for the Nano Fertiliser Plant.

Scale: SS process tanks

Boiler Pressure Parts & IBR

Boiler In-Bed Evaporator — 90 TPH Boiler

GHCL Limited · Sutrapada, Gujarat

Replacement of the in-bed evaporator of a 90 TPH boiler.

Scale: 90 TPH boiler

EPC & Complete Project Execution

Fabrication, Erection and Commissioning of 3 × 12 TPH Boilers

Gujarat

Fabrication, erection and commissioning of three 12 TPH boilers.

Scale: 3 × 12 TPH

High-Pressure Piping

Re-routing of IBR Steam Lines from Culverts to Above Ground

IOCL · Gujarat Refinery, Vadodara

Mechanical IBR piping: steam lines re-routed from under culverts to above-ground routing.

Scale: IBR steam piping

High-Pressure Piping

Replacement of IBR Piping in TPS/CGP

IOCL · Gujarat Refinery, Vadodara

Replacement of IBR piping in the TPS/CGP area of the refinery.

Scale: IBR piping replacement

High-Pressure Piping

CPP IBR and Non-IBR Piping

GSFC · Vadodara, Gujarat

IBR and non-IBR piping works for the captive power plant.

Scale: Captive power plant

High-Pressure Piping

8-inch HDPE Treated-Wastewater Pipeline

Vedanta — Cairn Oil & Gas · Suvali, Gujarat

Above-ground and underground 8-inch HDPE treated-wastewater pipeline of 4.8 km.

Scale: 4.8 km HDPE pipeline

Have an industrial project or shutdown requirement?

Discuss your equipment replacement, repair, fabrication, erection or complete mechanical project requirements with our team.