Core service 03

Reactor Replacement, Repair & Mechanical Installation

Complete reactor replacement, repair, dismantling and installation — vessels, internals and assemblies, with heavy lifting, interconnecting piping and plant integration.

  • Complete Reactor Replacement
  • Equipment Installation
  • Internals & Assemblies
  • Mechanical Repair
  • Piping
  • Structural Works

Complete reactor replacement, repair, dismantling and installation, including associated heavy equipment handling and mechanical works.

Our capabilities extend to reactor vessels, internals, assemblies and associated components, along with structural fabrication, interconnecting piping and plant mechanical integration.

A reactor job brings every discipline together: a heavy lift planned to the centimetre, internals that must be installed to the licensor’s sequence, pressure-part welding to code and connected piping reinstated without leaks. SGE plans these jobs as one package — engineering of the lift, fabrication, welding, heat treatment, testing and box-up — so the plant deals with one accountable contractor.

Our references include the installation and replacement of urea reactor trays at IFFCO, Kalol, under Casale licence, and the replacement of shell parts of the second vacuum separator in the urea plant of GNFC, Bharuch. With lifting and erection capability up to 500 MT, our own fabrication facility at Dashrath (Vadodara) and in-house PWHT, we take on complete reactor replacement as well as internals and repair work.

Detailed work scope

What we replace, repair, fabricate and install

  • Complete reactor replacementDisconnection, removal of the old reactor and erection of the new one
  • Reactor vesselsShell, nozzle and head repairs, and replacement of shell sections
  • Reactor internalsTrays, baskets, grids, distributors, liners and supports
  • Urea reactor traysInstallation and replacement under licensor supervision
  • Pressure vessels and separatorsReplacement of shell parts and pressure-part repairs
  • Heavy equipment handlingLifting, shifting, positioning, alignment and levelling
  • Foundations interfaceAnchor bolts, sole plates, packing and grouting coordination
  • Interconnecting pipingNozzle tie-ins, removal and reinstatement of connected piping
  • Structural fabricationPlatforms, ladders, supports and temporary lifting structures
  • Plant mechanical integrationInstruments supports, insulation and box-up coordination

Execution methodology

How we execute the work

  1. 01

    Survey and engineering

    Site survey, dimensional checks of nozzles and foundations, weights and centre of gravity, and a lifting and rigging plan with crane selection up to 500 MT.

  2. 02

    Preparation

    Approved drawings and procedures, WPS/PQR for the vessel materials, pre-fabrication of spools and supports, and access and laydown areas agreed with the plant.

  3. 03

    Disconnection and removal

    Piping and instrument connections removed and tagged, internals or the complete reactor dismantled and lifted out under permit-to-work.

  4. 04

    Erection and alignment

    New reactor or components erected, aligned and levelled to drawing tolerances; internals installed to the licensor's sequence and checks.

  5. 05

    Welding and heat treatment

    Shell, nozzle and piping joints welded by qualified welders, with PWHT and DHT where required.

  6. 06

    Inspection and testing

    NDT, dimensional and internal inspection, and hydraulic or pneumatic testing as specified, witnessed by the client or third party.

  7. 07

    Box-up and handover

    Connections reinstated, insulation and structures restored, and the record dossier handed over for start-up.

Codes & standards

Work to the applicable codes and your specification

  • Licensor and OEM specifications and approved drawings
  • ASME Section VIII and ASME Section IX, as specified
  • ASME B31.3 for interconnecting piping
  • Approved rigging plans and lifting procedures

Materials we work with

  • Carbon steel
  • Low-alloy steel
  • Stainless steel
  • Urea-grade stainless steel

Records you receive

Material certificates, WPS/PQR and welder qualifications, fit-up and weld records, PWHT charts, NDT and test reports — compiled into one indexed dossier.

Project references

Jobs we have executed

Reactor Replacement & Repair

Installation and Replacement of Urea Reactor Trays

IFFCO · Kalol, Gujarat

Installation and replacement of urea reactor trays under Casale licence, with internal access, fit-up and inspection.

Scale: Urea reactor internals

Reactor Replacement & Repair

Replacement of Shell Parts — Second Vacuum Separator

GNFC · Bharuch, Gujarat

Replacement of shell parts of the second vacuum separator, a urea plant pressure part, with welding, heat treatment and testing.

Scale: Urea plant pressure part

From our sites

View the full gallery

See all projects → Completion certificates →

Send us your requirement

Request a quote — Reactor Replacement & Repair

To prepare a realistic scope and schedule quickly, please share:

  1. Reactor or vessel type, service, size and weight
  2. Scope — complete replacement, internals, shell repair or piping
  3. General arrangement and nozzle drawings
  4. Plant location, access constraints and shutdown window

Attach drawings, datasheets or inspection reports to the form below (PDF, DWG, images, Excel or Word), or email them to info@sgeco.in.

We reply within one working day. See our privacy notice.

Have an industrial project or shutdown requirement?

Discuss your equipment replacement, repair, fabrication, erection or complete mechanical project requirements with our team.

Shree Ganesh Engineering Co.