Core service 01

Boiler Pressure Parts Replacement, Repair & IBR Services

Replacement, repair and installation of boiler pressure parts, tube banks, modules and coils for industrial boilers and HRSGs, with annual IBR inspection support.

  • Boiler bank and waterwall tubes
  • Economizer
  • Superheater
  • Reheater
  • Modules & Assemblies
  • IBR Compliance

Specialized replacement, repair and installation of boiler pressure parts, tube banks, modules, coils and associated assemblies for industrial boilers and HRSGs.

Our capabilities include waterwall tubes, boiler bank tubes, economizer, superheater and reheater coils, boiler modules, headers, pressure parts and associated mechanical components.

We also provide annual statutory IBR inspection preparation, coordination, defect rectification support and documentation for certificate renewal. The statutory inspection itself, and the certificate, are issued by the Directorate of Boilers of the state; SGE prepares the boiler, attends the inspection with your team, rectifies the defects found and compiles the records the inspector needs.

As a Special Class approved IBR contractor in Gujarat and Rajasthan, we have carried out boiler pressure-part work for fertilizer, refinery, petrochemical and captive power plants since 1979 — from a few failed tubes during a forced outage to the complete replacement of an air preheater by a 105 MT economizer. Erosion, corrosion, overheating and fatigue eventually call for replacement; our job is to do it inside your shutdown window, with every joint traceable and every record ready for the inspector.

Pressure-part joints are made by IBR-qualified welders to approved procedures in carbon and alloy steels up to T91/P91. Pre-heat, post-weld heat treatment and de-hydrogenation are carried out with our own equipment, and joints are examined by radiography and other NDT as the code and your inspection plan require.

Planning your next inspection? Read our guide to the annual IBR inspection and our guide to IBR compliance and the Directorate of Boilers.

Detailed work scope

What we replace, repair, fabricate and install

  • Waterwall tubes and panelsCutting out, panel or tube-by-tube replacement, membrane and fin welding
  • Boiler bank tubesReplacement, re-tubing, tube-to-drum expansion or welding as designed
  • Economizer coils and modulesPartial or complete replacement, including conversion of air preheaters
  • Superheater and reheater coilsReplacement of coils, loops, links and attachments in alloy steels
  • Headers, drums nipples and stubsHeader replacement, nipple and stub welding, hand-hole work
  • Boiler modules and assembliesRemoval and installation of complete modules with engineered rigging
  • FBC in-bed evaporators, bed coils and burner bendsFabrication, bending and replacement
  • Waste heat boilers and HRSGsHP, IP and LP pressure parts, liners, drains and vents
  • Associated piping, valves and mountingsFeed, steam, blow-down and safety-valve connections
  • Annual statutory IBR inspectionPreparation, coordination, defect rectification and documentation

Execution methodology

How we execute the work

  1. 01

    Survey and planning

    Joint review of the inspection report, thickness survey and failure history; scope, tube counts, materials, drawings and the shutdown schedule are frozen before the boiler is handed over.

  2. 02

    Approvals and procedures

    Repair or modification drawings and documents prepared for the Directorate of Boilers; WPS/PQR and IBR-qualified welders confirmed for every material and joint.

  3. 03

    Pre-fabrication

    Coils, panels, bends and assemblies are fabricated and inspected in our Dashrath (Vadodara) facility, so site time is spent on removal and installation.

  4. 04

    Dismantling and removal

    Access, scaffolding and rigging arranged; damaged tubes, coils or modules are cut out and removed with tubes and joints marked for traceability.

  5. 05

    Installation and welding

    New pressure parts fitted, aligned and welded by IBR-qualified welders, with pre-heat, PWHT and DHT where the material demands it.

  6. 06

    Inspection and testing

    Radiography and other NDT, hardness checks after PWHT, and the hydraulic test offered to the boiler inspector as required.

  7. 07

    Documentation and handover

    Complete record set — material certificates, welding and NDT records, PWHT charts and test reports — for the inspection and renewal file.

Codes & standards

Work to the applicable codes and your specification

  • Indian Boiler Regulations (IBR) and the Boilers Act
  • Approval of the Directorate of Boilers for repairs and modifications
  • ASME Section I where specified by the boiler OEM
  • ASME Section IX and IBR welder qualification
  • OEM drawings and client specifications

Materials we work with

  • Carbon steel
  • T11 / T22 / T91
  • P11 / P22 / P91
  • Stainless steel
  • Incoloy

Records you receive

Material certificates, WPS/PQR and welder qualifications, fit-up and weld records, PWHT charts, NDT and test reports — compiled into one indexed dossier.

Project references

Jobs we have executed

Boiler Pressure Parts & IBR

Replacement of APH (E-07) by Economizer

GSFC · Vadodara, Gujarat

Removal of the air pre-heater and installation of a new economizer in the SA-III plant.

Scale: 105 MT economizer

Boiler Pressure Parts & IBR

Replacement of Incoloy Liners — 101-CB Waste Heat Boiler

IFFCO · Kalol, Gujarat

Replacement of the high-alloy Incoloy liners of the 101-CB waste heat boilers.

Scale: High-alloy liner replacement

Boiler Pressure Parts & IBR

Boiler In-Bed Evaporator — 90 TPH Boiler

GHCL Limited · Sutrapada, Gujarat

Replacement of the in-bed evaporator of a 90 TPH boiler.

Scale: 90 TPH boiler

From our sites

View the full gallery

See all projects → Completion certificates →

Send us your requirement

Request a quote — Boiler Pressure Parts & IBR

To prepare a realistic scope and schedule quickly, please share:

  1. Boiler make, type and capacity (TPH), design pressure and temperature
  2. Pressure parts to be replaced — tube or coil numbers, sizes and material
  3. Latest inspection or thickness-survey report, if available
  4. Plant location and planned shutdown dates

Attach drawings, datasheets or inspection reports to the form below (PDF, DWG, images, Excel or Word), or email them to info@sgeco.in.

We reply within one working day. See our privacy notice.

Have an industrial project or shutdown requirement?

Discuss your equipment replacement, repair, fabrication, erection or complete mechanical project requirements with our team.

Shree Ganesh Engineering Co.