Core service 04

Industrial Heater Replacement, Repair & Maintenance

Process heater tubes, radiant and convection coils, banks, panels and modules replaced and repaired — from component-level work to complete heater replacement.

  • Heater Replacement
  • Radiant & Convection Coils
  • Tube Banks
  • Panels
  • Modules
  • Welding & Mechanical Works

Industrial process heater replacement, repair and associated mechanical maintenance for refinery, fertilizer and petrochemical facilities.

Our scope covers heater tubes, coils, banks, panels, modules and assemblies, along with associated headers, supports, structures, piping and welding works.

We undertake both component-level replacement and complete heater replacement assignments within the approved project scope.

Fired heaters set the throughput of the units they serve, and coil failures rarely wait for a convenient date. SGE replaces radiant and convection coils in fired heaters, fabricates and bends replacement coils in its own facility, and handles the casing, structural and piping works that come with them — so the heater can be returned to service on the planned day.

Our experience includes the erection of three Ketene furnaces, including refractory, and the replacement of convection and radiant coils in fired heaters. Coils and assemblies are pre-fabricated and tested in our Dashrath (Vadodara) facility wherever possible, which keeps hot work and time inside the operating unit to a minimum.

Detailed work scope

What we replace, repair, fabricate and install

  • Radiant coilsReplacement of tubes, return bends and complete radiant coils
  • Convection coils and tube banksBare and finned tube banks replaced as modules or tube by tube
  • Panels and modulesRemoval and installation of heater panels, modules and assemblies
  • Headers, crossovers and terminalsReplacement and re-welding of inlet and outlet connections
  • Tube supports, hangers and guidesReplacement of supports and tube sheets
  • Coil fabrication and bendingCoils fabricated in our facility, including cold bending of tubes up to 1.25D (up to 3″ OD)
  • Heater structures and casingStructural steel, casing panels, platforms and stack connections
  • Furnace erectionComplete heater and furnace erection, including refractory works
  • Associated pipingTransfer lines, crossovers and process piping connections
  • Complete heater replacementWithin the approved project scope

Execution methodology

How we execute the work

  1. 01

    Assessment and planning

    Coil drawings, tube counts, materials and the inspection findings reviewed; replacement by tube, coil or module decided with the plant to suit the shutdown window.

  2. 02

    Pre-fabrication

    New coils, bends and assemblies fabricated, heat-treated and pressure-tested in our facility where possible, ready for installation.

  3. 03

    Dismantling

    Casing, header-box and end-panel openings made; old coils and banks cut free and removed with planned rigging.

  4. 04

    Installation

    New coils, banks or modules installed, aligned and supported; crossovers and terminals fitted up to drawing.

  5. 05

    Welding and heat treatment

    Alloy and stainless joints welded to qualified procedures, with pre-heat and PWHT where required.

  6. 06

    Inspection and testing

    Radiography and other NDT, hardness checks and hydraulic testing of the coil as specified.

  7. 07

    Restoration and handover

    Casing, refractory interfaces and structures restored and the complete record set handed over.

Codes & standards

Work to the applicable codes and your specification

  • API 560 fired-heater practices, where specified
  • ASME B31.3 process piping
  • ASME Section IX welding qualification
  • OEM drawings and client specifications

Materials we work with

  • Carbon steel
  • Alloy steel (P5 / P9 / P11 / P22)
  • Stainless steel
  • Incoloy

Records you receive

Material certificates, WPS/PQR and welder qualifications, fit-up and weld records, PWHT charts, NDT and test reports — compiled into one indexed dossier.

Project references

Jobs we have executed

Industrial Heater Replacement & Repair

Erection of 3 Nos. Ketene Furnaces

Gujarat

Erection of Ketene furnaces 101, 102 and 103 including refractory.

Scale: 3 furnaces with refractory

See all projects → Completion certificates →

Send us your requirement

Request a quote — Industrial Heater Replacement & Repair

To prepare a realistic scope and schedule quickly, please share:

  1. Heater type and duty, coil drawings and tube schedule
  2. Scope — radiant coils, convection banks, modules or complete heater
  3. Tube material, size and quantity
  4. Plant location and planned shutdown window

Attach drawings, datasheets or inspection reports to the form below (PDF, DWG, images, Excel or Word), or email them to info@sgeco.in.

We reply within one working day. See our privacy notice.

Have an industrial project or shutdown requirement?

Discuss your equipment replacement, repair, fabrication, erection or complete mechanical project requirements with our team.

Shree Ganesh Engineering Co.