Core service 05

Heavy Equipment Erection & Installation

Heavy equipment erection, dismantling, replacement and installation — lifting up to 500 MT, shifting, positioning, alignment, piping and mechanical integration.

  • Reactors
  • Vessels
  • Columns
  • Heat Exchangers
  • Equipment Packages
  • Modules
  • Structural & Mechanical Installation

Heavy equipment erection, dismantling, replacement and installation for industrial plants and process facilities.

We undertake equipment handling, lifting coordination, shifting, positioning, alignment and installation, together with associated structural fabrication, piping and mechanical integration.

Heavy lifts inside operating plants leave no room for improvisation. Every SGE lift starts with a documented rigging plan — weights, centre of gravity, crane selection and lifting gear — prepared in-house and agreed with the plant before the equipment moves. With lifting and erection capability up to 500 MT, our own hydra, forklifts and multi-axle transport, and lifting tools carrying valid Form-10 certificates, we move equipment safely from the laydown area to its final position.

Our references include the replacement of the secondary waste heat exchanger 102-C at GSFC, Vadodara, the replacement of a 40 MT ammonia tube bundle at KRIBHCO, Hazira, the replacement of an air preheater by a 105 MT economizer at GSFC, and the erection of equipment, machinery and package units for the 400 MTPD Ammonium Sulphate-IV plant at GSFC. The work does not stop at the lift: alignment, interconnecting piping, structures and mechanical integration are completed by the same team.

Detailed work scope

What we replace, repair, fabricate and install

  • Complete equipment dismantlingDisconnection, cutting free and removal of old equipment
  • Lifting and riggingRigging plans, crane selection and spreader-beam design prepared in-house
  • Shifting and transport within the plantHydra, forklifts and multi-axle trailers
  • Positioning and erectionReactors, vessels, columns, drums and heat exchangers
  • Heat exchanger and tube bundle replacementBundle pulling, shell work and re-installation
  • Equipment packages and modulesSkid, package and module installation
  • Alignment, levelling and grouting coordinationTo drawing and OEM tolerances
  • Interconnecting pipingNozzle tie-ins, spools, supports and reinstatement
  • Structural fabricationSupports, platforms, pipe racks and temporary structures
  • Mechanical integrationAuxiliaries, Balance of Plant (BoP) connections and pre-commissioning support

Execution methodology

How we execute the work

  1. 01

    Lift engineering

    Weights, centre of gravity, lifting points and site constraints studied; rigging plan, crane selection up to 500 MT and spreader beams prepared and approved.

  2. 02

    Preparation

    Access, ground bearing and laydown areas readied; lifting tools checked with valid Form-10 certificates; connections isolated under permit.

  3. 03

    Dismantling and removal

    Piping, instruments and supports disconnected and tagged; old equipment cut free, rigged and removed.

  4. 04

    Erection

    New equipment lifted, positioned and set on its foundation or structure, following the approved lifting procedure.

  5. 05

    Alignment and integration

    Levelling and alignment to tolerance, anchor bolts and grouting coordination, and interconnecting piping and structures completed.

  6. 06

    Testing and handover

    Welds examined, pressure tests completed as specified, and records and as-built details handed over.

Codes & standards

Work to the applicable codes and your specification

  • Approved rigging plans and lifting procedures
  • Lifting tools with valid Form-10 certificates
  • ASME B31.3 for interconnecting piping
  • IS 800 and client structural specifications

Materials we work with

  • Carbon steel
  • Low-alloy steel
  • Stainless steel

Records you receive

Material certificates, WPS/PQR and welder qualifications, fit-up and weld records, PWHT charts, NDT and test reports — compiled into one indexed dossier.

Project references

Jobs we have executed

Heavy Equipment Erection

Secondary Waste Heat Exchanger 102-C Replacement

GSFC · Vadodara, Gujarat

Dismantling, rigging, removal and replacement of the secondary waste heat exchanger 102-C, with alignment and reconnection.

Scale: Waste heat exchanger

Heavy Equipment Erection

Replacement of 40 MT Ammonia Tube Bundle

KRIBHCO · Hazira, Gujarat

Critical IBR job: removal and replacement of the ammonia plant tube bundle during shutdown.

Scale: 40 MT tube bundle

From our sites

View the full gallery

See all projects → Completion certificates →

Send us your requirement

Request a quote — Heavy Equipment Erection

To prepare a realistic scope and schedule quickly, please share:

  1. Equipment type, weight and dimensions
  2. Scope — removal, erection, alignment, piping and structures
  3. General arrangement drawings and site layout
  4. Plant location, access constraints and shutdown window

Attach drawings, datasheets or inspection reports to the form below (PDF, DWG, images, Excel or Word), or email them to info@sgeco.in.

We reply within one working day. See our privacy notice.

Have an industrial project or shutdown requirement?

Discuss your equipment replacement, repair, fabrication, erection or complete mechanical project requirements with our team.

Shree Ganesh Engineering Co.