Heavy equipment erection, dismantling, replacement and installation for industrial plants and process facilities.
We undertake equipment handling, lifting coordination, shifting, positioning, alignment and installation, together with associated structural fabrication, piping and mechanical integration.
Heavy lifts inside operating plants leave no room for improvisation. Every SGE lift starts with a documented rigging plan — weights, centre of gravity, crane selection and lifting gear — prepared in-house and agreed with the plant before the equipment moves. With lifting and erection capability up to 500 MT, our own hydra, forklifts and multi-axle transport, and lifting tools carrying valid Form-10 certificates, we move equipment safely from the laydown area to its final position.
Our references include the replacement of the secondary waste heat exchanger 102-C at GSFC, Vadodara, the replacement of a 40 MT ammonia tube bundle at KRIBHCO, Hazira, the replacement of an air preheater by a 105 MT economizer at GSFC, and the erection of equipment, machinery and package units for the 400 MTPD Ammonium Sulphate-IV plant at GSFC. The work does not stop at the lift: alignment, interconnecting piping, structures and mechanical integration are completed by the same team.